Engineer-signed building work. Documented to the last unit.
We remediate, restore, fit out and rebuild the buildings that can't stop operating — residential strata and commercial property across NSW and the ACT. When a repair turns into a reconstruction, our team carries it through. DBP registered. CM3 prequalified. BuyNSW listed.
- A defect report you can read at AGM — written by people who will execute it.
- Engineer-issued scope, DBP declaration lodged on the NSW Building Commission portal.
- A Live Board updated daily — every unit, every stage, visible to the committee.
We don't dabble. Every discipline runs the same documented spine.
Waterproofing, concrete cancer, structural repair, heritage, fit-out and rebuild — diagnosed first, scoped to the engineer's drawing, executed to a standard the certifier will sign. The discipline is the point: focus is why engineers and strata managers send us back.
Waterproofing & water ingress
Balconies, planter boxes, podiums, wet areas, basement tanking.
Concrete cancer & spalling
Carbonation, chloride attack, post-tensioned slabs, façade soffits.
Structural repair
Crack injection, slab and beam strengthening, balcony reinstatement.
Pre-1980 buildings
Older walk-ups, terraces, mid-century concrete — what new builders miss.
Heritage works
Listed buildings, conservation management plans, sympathetic repair.
Government & schools
BuyNSW, SINSW, education and government remedial portfolios.
Building maintenance
Planned cyclical works, reactive defect rectification, Live Board reporting.
Three sectors. One standard.
The same engineer-led delivery spine, tuned to who's paying and who's affected by the work.
See every unit. Every defect. Every stage. Live.
On big buildings — 400+ units — defects don't follow a pattern. So we built a board that colour-codes every unit, ties it to the defect and the stage, and gives the strata committee, the building manager and the engineer a read-only link to watch progress in real time.
Below is a working demo seeded with realistic data from a George Street, Sydney tower — client identity withheld. Click any unit.
George Street, Sydney
Sydney CBD, NSW · 412 units
A six-step delivery spine. Every project. Every time.
The same documented process whether the building is 12 units in Surry Hills or 412 units in Zetland. Engineers know what to expect from us, and so do strata committees.
- 01
Site investigation
Thermal imaging, flood test, core sample, carbonation and chloride mapping. We measure before we quote so the scope is honest.
- 02
Defect report
A written, AGM-ready defect report suitable for the owners corporation, strata committee and engineer. Photos, locations, severity, recommended scope.
- 03
Engineer-issued scope
DBP-compliant specification issued by the engineer. We don't author structural scope — we deliver it.
- 04
Pre-construction pack
SWMS, JSEA, ITP, staging plan, subcontractor register, insurances, product data sheets and material schedules — issued before mobilisation.
- 05
Supervised execution
Our own tradespeople, ITP hold points, daily site diary, photo log, and the Live Board updated every day so the strata committee and building manager see exactly what's happening.
- 06
Handover
As-built, batch records, product data sheets, warranty pack, DBP declaration and NSW Building Commission portal lodgement.
The credentials your principal certifier will ask for.
Every box ticked, every certificate current, every declaration lodged. We treat compliance as a deliverable, not paperwork.
DBP Act 2020 registered
Design and Building Practitioners registration BUP0002823. Statutory declarations lodged on the NSW Building Commission portal for every class 2 building we deliver.
CM3 prequalified
Active CM3 prequalification — health, safety and environment systems audited and current. Verifiable to any principal or asset manager.
BuyNSW registered supplier
On the NSW government supplier panel. Procurement-ready for SINSW, Health Infrastructure and council asset works.
SafeWork NSW
High-risk construction work notifications lodged before mobilisation. SWMS and JSEA issued for every work pack.
Insurances
$20m public liability, $20m professional indemnity, $5m product liability, workers compensation current. Certificates of currency on request.
Strata Hub & portal lodgement
We interact with Strata Hub and the NSW Building Commission portal on the owners corporation's behalf — DBP declarations, occupation certificate evidence, defect rectification records.
Big buildings. Documented work.
Constraint, approach, outcome — and the documents we produced along the way.

Cricketers Arms Hotel — Est. 1921
Surry Hills, NSW · Heritage · Class 6 licensed venue
Full heritage façade restoration on an active licensed pub. Concrete cancer, render failure and parapet repair — delivered while the bistro stayed open seven days.
A Sydney landmark revived — original character preserved, residents and trade uninterrupted, heritage clearance and full documentation lodged with Council.

Lidcombe — 24 Unit Apartment Building
Lidcombe, NSW · Government-owned · Class 2 · 24 units
Structural failure to blade walls and footings of a government-owned 24-unit apartment building. Emergency propping, controlled demolition, new piles and footings, full rebuild under heavy-duty propping — residents managed safely throughout.
Building structurally sound and fully restored. Rebuilt to current NCC standards. Government principal sign-off at completion. Defects-liability documentation lodged. Major structural failure turned into a fully compliant, inhabited building.

167 George Street, Windsor — 1879 Heritage Rescue
Windsor, NSW · Heritage-listed · c.1879
An 1870s building on the verge of collapse — front wall failing, public safety at risk. Emergency approvals secured within days, building stabilised, then taken through full heritage repair and reopened as a wellness centre with an exceptional fit-out.
A piece of Windsor's 1879 streetscape saved. Building structurally restored, heritage character preserved, and re-opened as a wellness centre — landmark result for the town centre.

Double Bay — 6 Unit Heritage Rebuild (Buronga)
Double Bay, NSW · Heritage conservation area · 6 units
Six-unit residential building stopped halfway by authorities for non-compliant materials and defects. We re-engaged engineers and consultants, brought the project back to full compliance, and delivered six finished units behind the retained heritage street façade.
Six fully rebuilt modern units behind an intact heritage façade. Council and heritage compliance achieved. A stalled, non-compliant site turned into a landmark result for the Double Bay streetscape.

George Street, Sydney — 412-unit tower
Sydney CBD, NSW · Class 2 residential · 412 units · client confidential
Building-wide water ingress investigation and remediation across a 412-unit George Street tower. Every apartment surveyed, every defect colour-coded on a Live Board the strata committee, building manager and engineer watch in real time.
Hundreds of units returned to compliant, watertight condition. Every termination photographed, every batch recorded, every flood test witnessed. The Live Board is still the single source of truth the committee uses each month.

Zetland Residences — Building maintenance program
Zetland, NSW · Class 2 residential · 398 units
Long-term building maintenance program across a 398-unit Zetland tower. Planned cyclical works, fast-response defect rectification, and a Live Board the strata committee uses to track every job from request to sign-off.
A 398-unit building with no defect older than its agreed response window, full documentation per job, and a strata committee that runs meetings off the Live Board instead of reading status reports.
Send us the defect report. We'll send back a scope your engineer will sign.
Talk to a project director — typically same day.